Steel Building Case Studies

Case Studies

Hargreaves PLC (Rocpower)

Gemini has most recently been developing its ECO credentials working in partnership with Hargreaves PLC and their newly formed division of ROCPOWER. The development of the Yorkshire Electricity Board site required complete site clearance, excavation and infrastructure. Gemini supplied all civil operations to the site in order for Rocpower to install their engines and begin production. Encompassing a strict requirement

Read More

Empire MOT & Service Centre

A class 7 MOT station built from a virgin site to a functioning and lucrative business. Development of the site involved initial demolition and clearance, followed quickly with a reinforced concrete base to Ministry of Transport specifications. A none orthodox build requiring the mating of an existing hot rolled steel build to a new cold rolled steel structure with huge variance in both roof pitches. Energy efficient 80mm

Read More

Coleham Pumping Station

Gemini was asked to evaluate the best direction for the heritage trust in order to alleviate a shortage of storage space and replacement of existing failing buildings. Gemini demolished and cleared the site, excavated and formed a new slab. Once the new slab had cured a new purpose made building to meet with the councils requirements was supplied and erected within three days. “Gemini worked with us through the whole

Read More

Salford Children Holiday Home

Gemini was asked to provide a cost effective way to house a mini bus plus additional outdoor activity equipment for the registered charity. With a limited budget and huge task ahead, Gemini tackled this project with zest, preparing the site by clearance and demolition of the existing build. Jointly working with the manager of the centre the site was excavated and a new reinforced concrete slab laid. Once the slab was cured

Read More

Mr & Mrs Carter's Double Garage

Mr & Mrs Carter had to endure an incredibly long winded and painful process in the hands of their insurers after firstly sustaining adverse weather conditions damaging their garage beyond repair. Gemini was asked to negotiate with the Carter’s insurers to speed up the process and provided suitable storage for the imminent winter period. The site was initially cleared and excavated, this was swiftly followed by the

Read More

H. M. Prison Featherstone

A quick an easy answer to additional space that was required in a very short space of time, as developments and expansion of the Featherstone site were being undertaken by Kier Contracting. Gemini was asked to provide a quick and cost effective solution to a sudden shortage in storage space. “Gemini provided exactly what was on the tin, professionally and effectively, we would recommend them to anyone and everyone and we

Read More

Drayton Manor Park

GSB Ltd had the honour of providing the new home for the Thomas & Friends Exibition centre for all his faithful devotees, along with a small animal petting area, allowing interaction with animals at a young age. Everyone’s favourite theme park, packed with a host of great rides and attractions set in 280 acres of lakes and parkland. Drayton Manor features some of the biggest, wettest and scariest rides around!

Read More

Domestic Twin Carport

Mr Vithlani required a large carport to accommodate additional covered parking for his growing family. The build had to be sympathetic to the existing structure not to look out of place. The carport was constructed to encompass a water retention butt to help Mr Vithlani conserve water and keep his beautiful garden green. "We were very happy with our build and recommended Gemini to three of our friends, thank you" Mr Trib

Read More

Staffordshire County Show

Gemini were proud to represent the county at the Staffordshire County Show in May. Constructing two buildings for inspection from all the attendees, producing interest and enquiries for months to come. [gallery]

Read More

Major Services Ltd

A busy transport agency that required a repair unit to ensure that work carried out on all their vehicles was in a clean and dry environment. Major Services Ltd required this work to be completed without disrupting their operation. Gemini completed all works within 9 days, completing a 9m x 10m 6m high composite build with a specially designed roller shutter door, achieving record times. [gallery]

Read More

G & P Car Sales

A fast growing camper & caravanette conversion business, desperately in need of extra working space to complete thier contracts. A four bay unit was installed to minimum industrial specifications, within 13 working days, from instigation to completion [gallery]

Read More

Burnt Tree Vehicle Solutions

A fast moving operation requiring a new valeting bay. Services required from demolition to complete operational functionality, within an uninterrupted work schedule. Work commenced and final completion on handover involved 7 working days, therefore ensuring limited or no disruption to trading. "We were overjoyed with the quality and speed of the build and would definately use Gemini again" Kane Bowden, Burnt Tree Vehicle

Read More

Present Project

Gemini Steel Buildings had the pleasure of undertaking a new development in Stone, Staffordshire, following our attendance at the Staffordshire County Show May 2008. A virgin site with planning consent for a driving range and small service shop, this has evolved to providing an 81m driving range, a large sales and coffee area, putting green and car park facilities. Completion date mid February 2009. Watch this space for

Read More

JCB Ltd

The requirements of a large international organisation for speed and efficiency if hindered can be catastrophic. Gemini was contracted to construct a new pre delivery inspection unit, but during a 5 day shut down period to ensure smooth transition of production once they reopen. The building constructed to light industrial specifications measured 6m x 10m 5m high, two 5m x 5m roller shutter doors and one personal access

Read More